| RESUMEN DE
CAPITULOS |
| CAPITULO |
I |
MOVIMIENTO DE TIERRA |
2.298.642
|
| CAPITULO |
II |
RED DE SANEAMIENTO |
1.545.202
|
| CAPITULO |
III |
CIMENTACION Y ESTRUCTURA |
54.153.797
|
| CAPITULO |
IV |
ALBAÑILERIA |
105.199.212
|
| CAPITULO |
V |
CUBIERTAS |
32.261.358
|
| CAPITULO |
VI |
SOLADOS Y REVESTIMIENTOS |
13.084.122
|
| CAPITULO |
VII |
CERRAJ., CARPINT. Y VIDRIERIA |
11.958.118
|
| CAPITULO |
VIII |
INSTALACION DE CALEFACCION |
12.820.012
|
| CAPITULO |
IX |
INST. ELECTRICA E ILUMINACION |
9.722.323
|
| CAPITULO |
X |
INSTALACION DE FONTANERIA |
3.162.182
|
| CAPITULO |
XI |
PINTURA |
2.735.536
|
| CAPITULO |
XII |
VARIOS |
9.082.315
|
| CAPITULO |
XIII |
URBANIZACION |
410.000
|
| |
|
TOTAL EJECUCION MATERIAL......
|
258.432.819
|
| |
|
16 % DE GASTOS GENERALES...... |
41.349.251
|
 |
 |
|
| |
|
TOTAL PRESUPUESTO............. |
299.782.070
|